Worksmart Parking Initiative - Basildon Hospital

This Civil engineering project was carried out over a 4 month period between January and April 2011. A sympathetic design was established to enable planning approval in a sensitive green belt area, and was to include landscaping and tree planting as part of the scope of works. A mixture of hard and soft landscaping enabled us to provide adequate emergency vehicle access, and good disabled access, along with a softer more natural feel to the rest of the overflow car park area. A large amount of surface water and land drainage was installed to ensure the heavy clay rich soil did not revert back to the boggy area it has become.

In addition we also provided a controlled one way system, with a barrier access control. A CCTV and lighting package added to a safe and secure environment for the staff using the facility.

Project Title
Worksmart Parking Initiative
Start Date
January 2011
Client SEPT
Completion April 2011
Architect/Agent Huggins, Bromage, Ferguson LLP
Value £156,000
Contract Manager
Philip Pearson
Reference
B5392
October Waste Report
Doing our bit for the Environment and recycling 93% of our waste in August, preventing 37.2 cubic yards of waste going to landfill....
Opportunity Thurrock 2018 -Great Day
A great and productive day yesterday at the 2018 Opportunity Thurrock careers event at Tilbury...